Preventive Maintenance of the New Valves
1: It is very important to choose the suitable valve during the designing stage for the project. In valve technology book, there must be clear requirements of materials, accessories and test standards.
2: Be sure the specification and type for the sealant joints, internal single direction valve and valve vent (sewage connector).
3: Adequate protection should be done before installation as well as being after installation.
4: Maintenance before the valves are into operation
a: After activity of each time during the construction process;
b: After the end of the valve welding;
c: After hydrostatic test;
d: After completion;
e: Do one time’s maintenance per three months during the first year, and during the second year do one time’s maintenance per half year, and after two years, do one time’s maintenance a year.
Maintenance before application.
1、 visual inspection
All transport packaging complies with the requirements of technical specifications;
Connector, anti-fouling material and the moisture of the wood cover;
Welding ends and Flanged ends with a corrosion protection layer;
No significant damage after visual inspection and the body surface should meet the technical specification requirements.
2、Supervision
Use the marked rings;
Use the lifting of the chain, the external coating for protective measures;
When the valve with brackets and transmission, the sling is fixed in the valve rings, rather than the transmission;
Slings and lifting chain can not be met out into the height of the tube or the tube as a support.
3、 Maintenance work of valve installation and welding:
(1) the valve is installed prior to welding operations
Make sure the position of the valve which shows "open";
To inject Sealweld lubricants and grease to protect the body and seal piping according to the different brands and specifications of the valves;
Wipe the protection of the valve ball internal smear grease, lubricants and grease applied in the ring and ball;
Reinforced valve port;
Rust treatment on all threads;
Recognizing the stem, the grease port connector does not have any paint;
Buried ball valve is installed, confirm that the manipulation shaft coat the ball with the drive mechanism on the ground;
Check the buried ball valves up to an extension of the gland, hold the control surface of the ground and make the logo.
(2) the protection of the valve welding job
Confirm valve preheating and welding in the "open" position;
Valve must be supported in the base and can slide freely in the axial direction;
Welding, ball valve internal seal temperature does not exceed 140 ° C, the external fat injection port temperature does not exceed 80 ° C;
Promptly after the end of welding add a smooth fat;
Verify that the variety of connectors are not loose;
Confirm the outfall, the pressure which the port is in the locked state;
Turn the valve 1/2 "open" or "off", to confirm the smooth operation;
After soldering is completed the pressure test to confirm the valve in good condition.
(B) valve pressure test monitoring and protection of the sealing system
A stress test when the operating range
⑴ water pressure test
When cleaning the pipe before the pressure test to determine the valve in full "on" state;
In the pipeline is filled with water, make sure the ball valve half-open at 10 ° -45 °;
Pressure in the pipeline, check all joints for leaks;
Manometry after the implementation of sewage operations to clear the body of the pressure and impurities;
Valve replies "on" state;
Add lubricants lipid;
Correct supervision of site personnel to operate the valve;
Supervision of the pressure test to meet the technical requirements.
⑵ test pressure stage
Pressure test the correct position of the first check valve;
Valve is fully open and for the foam test;
Valve is fully closed, and for the foam test;
Valve to restore the normal running position;
Add lubricants lipid;
Do stem test.
Monitoring valve while pipeline is with pressure. Fix it immediately if leaks;
a: To grease operations for all ball valves.
b: To shut down the operating for all the ball valves.
c: Check sealing of the valves.
d: Keep all ball valves being fully open operating.
e: Close the sewage mouth after sewaging again.
f:Complement again the smooth fat to run.